Fees

Design fees

I do not work to a flat rate per square metre. Every commission is priced individually, because floor area alone does not determine how much design work is involved.

Why pricing is individual

Two buildings of the same floor area can differ twofold in the work required. A simple farm building on flat ground is a different proposition from a house on a sloping plot with a basement, several level changes and a landscape protection consultation.

I therefore quote once I know the site and the brief. The quotation is itemised stage by stage, so nothing comes as a surprise later.

What affects the fee

FactorWhy it mattersEffect
Building typeResidential, agricultural and tourism buildings face different requirementsSignificant
Floor area and storeysMore drawings, more complex structureSignificant
Site conditionsSlope, basement, earthworks, unfavourable orientationModerate to significant
Type of procedureNotification, permit or combined procedureModerate
Number of disciplinesStructure, mechanical, electrical, energy, fire safetyModerate
Bespoke structuresLong spans, exposed concrete, one-off timber structuresModerate
Protected statusLandscape protection, historic setting, World Heritage candidate areaModerate

What the fee covers

The contract sets out which stages the commission covers. The fee typically includes:

  • meetings and the site visit,
  • the concept design and the agreed number of revision rounds,
  • the documentation required for the agreed procedure,
  • submission and correspondence with the authority,
  • coordination of the engineering designers, where the commission is for lead consultancy.

Costs worth budgeting separately

  • Official procedure and administrative service fees.
  • Land survey and soil investigation report.
  • Engineering drawings, where the commission is not for lead consultancy.
  • Energy performance certificate for occupancy approval.
  • Visualisations and animation, if requested separately.
  • Design supervision during construction, if not included in the contract.

Payment schedule

The fee is tied to stages, so payment follows the work: on acceptance of the concept, on delivery of the documentation for the authority, and on completion of the construction drawings. Exact proportions are set out in the contract.

The first consultation is free and without obligation. I clarify the task there and send a written quotation on that basis.